7.16 Pipe Grade

The surveyor must calculate the new grades and where significantly different (greater than 15% variation in grade), the actual grade must be annotated on the design plan longitudinal section.

Drop Structure Detail

Figure 27 Drop Structure Detail.

Transition and/or Drop

Figure 28 Transition and/or Drop.

Inlet Pits

Figure 29 Inlet Pits

Figure 30

Figure 30

Manholes

Figure 31 Manholes