7.16 Pipe Grade
The surveyor must calculate the new grades and where significantly different (greater than 15% variation in grade), the actual grade must be annotated on the design plan longitudinal section.
Figure 27 Drop Structure Detail.
Figure 28 Transition and/or Drop.
Figure 29 Inlet Pits
Figure 30
Figure 31 Manholes