Site Management Plans
The Site (EMP) Kit provides land developers, consultants and contractors with a step by step process for developing a comprehensive site specific Environmental Management Plan for subdivision construction sites.
The Site EMP should identify the environmental risks for the site, their likelihood and consequence, along with environmental protection measures which are proposed to manage this risk.
The Site (EMP) Kit was developed by the City of Casey, Shire of Cardinia and Mornington Peninsula Shire Council, with assistance from Melbourne Water and the Environment Protection Authority. The project was assisted with funding from the Victorian Government, as part of the Stormwater Action Program.
The Kit comprises two parts:
Guidance Notes
The major components of the Guidance Notes include:
- Requirements for environmental management on subdivision construction sites.
- Risk assessment guidance
- Lists of environmental protection measures that may be appropriate for use on your site
- Self-check checklists to aid in internal reviews of Site EMPs and their implementation
Template:
The Template consists of two plans. Plan 1 includes a space for a site plan and boxes for narrative, to detail the types and locations of environmental protection measures on the site. Plan 2 includes a risk assessment checklist and an area for designs of the environmental protection measures that will be used on the site.
The Guidance Notes are designed to be printed in A4 size. Plans developed in accordance with the Template must be submitted in A1 size.
Download the .zip file (554kb) including all options, or select the appropriate option below:
- Site Management Plan Template :
- .PDF format (92kb)
- .DWG format (103kb)
- Word format (68kb)
- Site Management Plan Guidance Notes :
NB : If, after clicking the file above, it appears in your browser, right click the link and select "Save target as" (Internet Explorer) or "Save link as" (Netscape). You will then be prompted for where to save the file.
